Push Planning · Streetworks · Traffic Management

Gas mains replacement,
planned properly.

Street-by-street sequencing, realistic durations, TM strategy and NRSWA notice timelines for your mains replacement schemes, planned by an engineer who has delivered them on the ground.

Project Delivery. Made Easy.

10+ Years Gas Distribution
SCO AE Authorising Engineer
Fixed Price Per Scheme

Tell us about your programme and we'll send our terms, rates and a sample push plan.

What You Get

A Plan Ready to Permit

Every push plan is built from your scheme drawings and planned the way your gangs actually work, so your streetworks team can permit against it and your managers can spend their time on site.

Street-by-Street Sequencing

Planned to your preferred method, live or dead insertion, with gang deployment set out section by section.

Realistic Durations

Durations based on real delivery experience, to reduce the risk of overruns, Section 74 charges and FPNs.

TM Strategy Per Street

A traffic management approach for every street, with CAD TM drawings coordinated with your TM provider under your job number.

NRSWA Notice Timelines

Notice and permit timelines built back from your start date, with traffic-sensitive streets and school proximity accounted for.

Conflict Checks & Diversions

A roadworks conflict check across the scheme area and proposed diversion routes where closures are needed.

HPP Assessment

An assessment of whether the scheme is a High Profile Project, with tailored communication for residents and road users to cut complaints.

Also available: SCO Authorising Engineer support and writing routine operations. Terms of business are available on request.

How It Works

From Enquiry to Sign-Off

Get set up once, then instruct schemes whenever you need them. A plan is complete when the highway authority approves your notices and your Operations Manager signs it off.

1
Get in touch Request more information, our terms and a sample push plan.
2
Get set up Terms agreed and XGrid set up on your supplier system, with insurance and documents supplied.
3
Send a scheme Email the scheme PDF and Planning Request Form. Delivery date confirmed within 2 working days.
4
Approved & signed off Highway authority approves the notices and your Operations Manager signs off the plan.

Ways to Work Together

Flexible Support

Use XGrid for a one-off scheme that's tricky to plan, or as a planning extension of your team across a rolling programme.

Option 2

Monthly Planning Retainer

A set number of planning days each month, working as an extension of your team.

  • Ideal for rolling mains replacement programmes
  • Day and half-day rates available
  • Site, office and highway inspector visits by arrangement

Who You'll Work With

Planned by Someone Who's Done It

No generic planners. Every scheme is planned personally by an engineer who has delivered mains replacement on the ground.

MH

Matt Hughes

Founder, XGrid Solutions Ltd

Matt spent over a decade in gas distribution at Wales & West Utilities, planning and delivering mains replacement schemes, before moving into principal contractor project management on major civil and pipeline infrastructure.

He founded XGrid Solutions to give contractors planning they can rely on: plans written with the gangs, the highway authority and the residents in mind.

SCO Authorising Engineer SCO Competent Person NRSWA Supervisor SMSTS NEBOSH Temporary Works Supervisor EUSR

What's Next

One Platform.
Every Utility.

We're building the XGrid platform: AI-assisted planning software that takes the same engineering rules behind our manual push plans and turns a scheme drawing into a draft push plan in a fraction of the time.

Reads the Scheme

Upload the scheme drawing and the platform picks out the streets, pipe lengths, diameters and connection points, ready for planning.

Checks Every Street

Pulls in street data such as traffic sensitivity, road category and nearby schools, and checks for clashing roadworks across the scheme area.

Drafts the Plan

Applies proven planning rules for sequencing, durations, TM and notice periods to produce a draft plan, which is then checked and signed off by an engineer.

We're starting with gas, then extending to water, electric and telecoms. Before then, we'll also be adding non-routine operation (NRO) writing and MP/IP planning for major infrastructure projects to our planning services.

Gas
Launching First
Water
Coming Soon
Electric
Coming Soon
Telecoms
Coming Soon

Companies using our planning service now will be first to trial the platform, and their feedback will shape how it works. Join the waitlist and we'll let you know when early access opens.

Thanks, you're on the list. We'll be in touch when the XGrid platform is ready for early access.
Something went wrong. Please try again or email us directly.

No spam. See our privacy policy.

Planning Pressure on Your Programme?

Get in touch for our terms, rates and a sample push plan, or to arrange a quick call. Once you're set up, schemes can be sent over whenever you need them.

The button opens a new email in Outlook (or your default mail app) addressed to us. Using webmail? Copy our address below.